Machine Capacity & Speed:

 

Electrical Specification:

 

Pneumatic Specification:

Timber Height:     

50mm - 304mm

Supply Voltage:

380/415 @ 50Hz

Air Supply:

550Kpa - 850Kpa

Timber Thickness:

25mm - 76mm

 

(3 Phase Earth & Neutral).

 

(non lubricated dry air)

Timber Length:

1.8m - 8.0m

 

 

Consumption:

0.7 cubic m/min

 

 

 

 

 

24.7 cubic ft/min

Machine Speed:

70m/min - 105m/min

 

 

 

 

 

Machine Size & Weight:

 

Control Console Size & Weight:

Length: 'B'

2667mm

Height 'A'

985mm

Width:  'C'

1265mm

Width 'B'

800mm

Height: 'A'

1500mm

Depth 'C'

400mm

Working Height:'D'

845mm

Weight:

100Kg

Weight:

1250Kg

 

 

 

 

 

 

 

 

     

Machine Capacity Throughput Tables: ( allowing 1 metre between pieces )

 

Timber Length:

 

Throughput of Pieces Per Minute: (allowing 1 metre gap between each piece)

 

Volume Per Hour in Cubic Metres     @ 70 Metres Per Minute:

 

Volume Per Hour in Cubic Metres @ 105 Metres Per Minute:

 

@ 70 m/min

 

@ 105 m/min

Size: 75*200

 

Size: 75*225

Size: 47*100

 

Size: 47*150

 

Size: 47*200

 

Size: 47*225

3.0m

17.5

26.3

47.25m³

53.17m³

22.25m³

33.37m³

44.50m³

50.06m³

3.3m

16.3

24.4

48.41m³

54.46m³

22.71m³

34.06m³

45.41m³

51.09m³

3.6m

15.2

22.8

49.25m³

55.40m³

23.15m³

34.72m³

46.29m³

52.08m³

3.9m

14.3

21.4

50.19m³

56.47m³

23.54m³

35.30m³

47.07m³

52.96m³

4.2m

13.5

20.2

51.03m³

57.41m³

23.92m³

35.89m³

47.85m³

53.83m³

4.5m

12.7

19.1

51.44m³

57.86m³

24.24m³

36.36m³

48.48m³

54.54m³

4.8m

12.1

18.1

52.23m³

58.81m³

24.50m³

36.75m³

49.00m³

55.15m³

5.1m

11.5

17.2

52.79m³

59.39m³

24.74m³

37.11m³

49.47m³

55.66m³

5.4m

10.9

16.4

52.97m³

60.00m³

24.97m³

37.46m³

49.95m³

56.19m³

5.9m

10.1

15.2

53.63m³

60.33m³

25.29m³

37.93m³

50.58m³

56.90m³

 

Example: [47mm * 100mm * 3m Long @ 105m/min]  -  0.047m * 0.1m * 3.0m = 0.0141m³ volume per piece.

0.0141m³ * 26.3 pieces per minute = 0.37083m³ per minute * 60 = 22.25m³ per hour.

NOTE: When calculating achievable throughput it is suggested that between 50% and 75% of the above values are used.

 

 

Back